The Hocking County Engineer's Office requires permits for all work done within a road's right-of-way.

Permits are required for installation of a driveway; utility work consisting of road cuts, bore pits and trenching within the right-of-way; tapping into roadside drainage tiles; and hauling overweight items.

Some permit applications may include a performance bond to ensure proper procedures are followed.

To apply for a permit, click on the appropriate link below to download an application.  Bring or mail the application to:

The Hocking County Engineer's Office
1286 California Avenue
Logan, Ohio 43138
Office Hours: 7:00-3:30 Monday-Friday
Phone - (740) 385-8543
Fax - (740) 385-0542
 
Underground Construction on Hocking County Right-Of-Way:



Load Limit Permit:



Road Repair Agreeement:



Driveway & Roadside Pipe Policy (Permit):



 
FROST LAW:
  EFFECTIVE FEBRUARY 1, 2009 THE LEGAL LOAD LIMIT ON ALL HOCKING COUNTY ROADS WILL BE REDUCED BY 50% WITH THE EXCEPTION OF COUNTY ROAD 33A, CHIEFTAIN DRIVE, COUNTY ROAD 33B, HOCKING DRIVE AND COUNTY ROAD 25, HAYDENVILLE ROAD. 
THIS LEGAL LOAD LIMIT REDUCTION WILL BE IN EFFECT FROM FEBRUARY 1, 2009 TO APRIL 30, 2009.   ( SEE ARTICLE UNDER "NEWS RELEASES" TAB)
BY CLICKING ON THE ROAD REPAIR AGREEMENT ABOVE, YOU MAY DOWNLOAD  THE NECESSARY APPLICATION FORM AND MAIL OR FAX TO THE HOCKING COUNTY ENGINEER'S OFFICE, 1286 CALIFORNIA AVENUE, LOGAN, OHIO 43138 OR FAX 740-385-0542